Projects
Mineral Processing and Mine Infrastructure

Cadia Cyclowash Plant
Newcrest Mining
MER provided EPCM services for modification of an existing tailings separation plant at Cadia Gold Mine in NSW using cyclowash technology, including process engineering, equipment procurement, specification development, detailed design of mechanical, electrical, piping, and structural engineering components of the plant, onsite construction management and commissioning support.

Cowal Gold Underground Project
Evolution Mining
MER provided engineering design and project management services across all phases of the project from development of the PFS through the Feasibility Study phase and into Execution. During the execution phase, MER was engaged to deliver detailed design services to support procurement packages, complete infrastructure design and provide plant interface engineering.

Mineral Hill Restart Project
Kingston Resources
MER provided engineering design and project management services for the restart of an open pit and underground operation for an established gold-copper mine in NSW, including detailed design of a site electrical upgrade and Poly Amyl Xanthate (PAX) plant, 3D model development and drawings, functional safety workshop facilitation and risk assessment, and tender management.

Hydrofloat Tailings Feasibility Study
Newcrest Mining
MER provided feasibility engineering services for integration of a sand tailings pumping station into the Cadia Gold Mine processing plant in NSW. The project included design development, equipment selection, flowchart development, process engineering, mechanical engineering and structural engineering services for a 900 tph tailings dewatering tower.

Cadia Projects & Studies
Newmont
MER provides ongoing project management study management, and project engineering services for numerous multi-disciplinary projects at Cadia Gold Mine, from concept phase through to feasibility, detailed design and execution. Projects to date have included bridge construction, pipeline installation, road construction, mine ventilation, underground and surface dust suppression, and various processing plant upgrades.

Mount Lyell Underground Restart Project
New Century Resources
MER completed an engineering feasibility study, including capital and operating cost estimate, for the restart of the copper, gold and silver Mount Lyell underground mine in Tasmania. MER was responsible for the non-processing infrastructure including high voltage power supply to the mine, mining workshops, offices, ventilation, underground dewatering and water supply services.
Tailings Design & Governance

Fosterville Gold Mine EoR Services
Agnico Eagle
MER provides Engineer of Record (EoR) services for the critical tailings and water management facilities at Fosterville Gold Mine in VIC, including detailed reviews and provision of geotechnical advice related to designs, construction records, monitoring data (VWPs, standpipe piezometers, survey prisms, InSAR, surface vibration monitors), site investigation (CPTU, boreholes, hand augers, test pits, shear vanes, seismic testing, laboratory testing), operational documentation including the operations manual and emergency response plan, Triggered Action Response Plans (TARPs), and compliance with the protocols of Towards Sustainable Mining (TSM)

Mineral Hill Mine EoR & Design Services
Kingston Resources
MER provides Engineer of Record (EoR) and design services for the tailings facilities at Mineral Hill Gold Mine in NSW, including detailed reviews and provision of geotechnical advice related to TSF designs, construction records, monitoring data (e.g. VWPs, survey prisms), site investigation (CPTU, boreholes, test pits, seismic testing, in-situ and lab testing), tailings deposited density reconciliation, TSF inspection reports, Triggered Action Response Plans (TARPs), and blasting-induced vibration monitoring. Design services include in-pit tailings facility (IPTSF) assessment, TSF site selection, dam break analysis and design for a new above-ground TSF.

Broula King TSF Stability & HRA Report
Broula King Enterprises
MER carried out a slope stability analysis and High Risk Activity (HRA) assessment for a TSF at Broula King Gold Mine in NSW. The work included characterisation of tailings, embankment fill and foundation materials, 2D Limit Equilibrium slope stability analysis (Slope/W) under drained, undrained and post-seismic loading conditions, review of available freeboard and required storm storage capacities in accordance with ANCOLD guidelines, facilitiation of a risk assessment workshop for a planned water pumping and evaporation system, and provision of a Triggered Action Response Plan (TARP) for implementation during water tranfer operations.
Energy & Renewables

Eloise Expansion HV Power Station
AIC Mines
MER provided a power system assessment and project management for the Eloise Expansion project in QLD, assessing the plant’s total demand and aligning 11 kV generation with project and operational requirements, modelling dispatch optimisation, managing procurement of new electrical distribution infrastructure, and ensuring compliance and reliable integration with site systems.

Kachi Lithium Mine Power Station
Lake Resources
MER provided Owners Engineering and feasibility services for the development of a 50 MW power station for the Kachi Lithium Project in Argentina. MER was engaged to deliver an assessment of the potential high voltage grid connected power options and advise on the renewable power trade-offs against traditional base load generation.

Misima Island Hybrid Power Station
Kingston Resources
MER provided an engineering design and feasibility assessment for the development of the power station on Misima Island in Papua New Guinea (PNG). MER was engaged to deliver a power study using HOMER to optimise the mix of available generation identified as hydro-electric, solar, wind and battery, underpinned by traditional generation to support the island’s power supply requirements.

Flare Radiation Assessment
Akkurat
MER undertook detailed design calculations for a flare radiation assessment to determine the radiation zone and gas dispersion zone / hazardous area for DN100 and DN150 flare skids, including provision of flow rates and exclusion zones for humans and vegetation.

Beach Energy Piping Analysis
Long Energy
MER undertook detailed design calculations for the design of LPG piping to API specifications. The engineering involved design calculations to determine wall thickness, pipe stress and fatigue in accordance with the API code.

Geothermal Power Station Feasibility
Solution Energy
MER undertook an initial Feasibility Study to assess the scale-up of new geothermal subsurface production technology and an Organic Rankine Cycle power generation plant.
Civil & Industrial Infrastructure

Autocycle Tyre Recycling Plant
Autocycle International
MER provided project management and detailed design services for a new tyre recycling plant in VIC, including development of the Design & Construct packaging strategy, building permit staging, development of the plant layout based on functional requirements, operational efficiency, safety controls and mobile plant selection, and detailed design of the services, instrumentation & PLC controls, electrical scope (new 11kv substation) and structural / architectural upgrades.

Cooinda Waters Bridge
Bland Shire Council
MER undertook a condition assessment and structural audit of an existing pedestrian bridge, followed by a detailed design to ensure that the bridge met Australian standards for limit states and accessibility. The engineering involved structural design calculations, modelling, thermal fatigue analysis and assessment against accessibility standards. MER provided detailed construction drawings and construction methodology to ensure safe modification of the bridge.

CGO Dirty Water
Evolution Mining
MER completed a detailed pumping capacity assessment and the design of subsequent upgrades of an underground mine dirty water pumping system at Cowal Gold Operations. The engineering scope included assessment of the existing pumping, piping and electrical infrastructure, followed by liaison with the OEM and detailed design of piping and pumping upgrades. Deliverables included Process Mass Balances, PFDs, PID, Dirty Water System Options Report, Pump Datasheet, SOW and Technical Specification.